Dry Lining Suspended Ceilings Partitions Plastering

Dry lining & Plastering Ceilings Partitions

Dry lining & Plastering Ceilings Partitions

Dry Lining Suspended Ceilings Partitions Plastering
LONDON SE1
The
Shard
Level 24/25
Completed: 2015
New Build Commercial Fit Out
OSREND worked alongside Division-1 to deliver this beautifully designed and high-profile project at the Shard.
The end client, TOG (The Office Group), provide co-working space and private short-term offices over level 24 and 25 at the most iconic of London buildings.
Carrying out the plastering on this project proved to be a challenge as heat from the summer sun through the glass raised temperatures on site to +30c and accelerated the setting time. We had to make some adjustments to our usual practice to ensure the finish product lived up to expectations for such an iconic building.
Main Contractor: Modus Workspace Ltd
Project Value: £50k